Here are some pictures of a project that took just over a year of weekends. From deconstruction to final product. The footings were a bear to dig, probably the worst part of the project. The town code is 48" deep, and required one of those 24" diameter plastic footings at the bottom.



Collapsed manhole under the deck, Needed to get a new one.










Getting stair stringers correct is not easy. There were many throw aways.